Steel Frames WA

Perth Brick Shortage 2026: Why Builders Are Turning to Steel Frames

Perth’s construction industry is facing another challenge, with brick supply shortages affecting residential building projects across Western Australia.

Increased housing demand, reduced manufacturing capacity and new supply restrictions have left builders facing uncertainty over material availability and construction timelines.

With no immediate resolution to the shortage, some builders are reconsidering their reliance on traditional double-brick construction. Steel framing is one alternative attracting attention, providing a prefabricated structural system that can reduce brick requirements and help builders manage construction schedules.

Key Summary

  • Perth is experiencing a brick shortage, with Midland Brick introducing supply allocations from October 2026 as demand exceeds production capacity.
  • Builders are facing potential construction delays, particularly smaller operators with limited access to brick allocations.
  • Steel framing offers an alternative to double brick, reducing reliance on structural masonry and allowing greater flexibility in external wall finishes.
  • Steel Frames WA supports builders with the design, manufacture, supply and installation of prefabricated steel framing systems.

What’s Causing the Perth Brick Shortage?

Western Australia’s brick shortage is largely the result of strong housing construction demand combined with reduced local manufacturing capacity.

Why Is WA Running Short of Bricks?

There are three main factors contributing to the shortage:

  1. Increased housing demand: WA’s population growth and residential construction activity have significantly increased demand for building materials.
  2. Reduced local production: Austral Bricks mothballed its Cardup manufacturing facility in April 2023, leaving Midland Brick as WA’s only major operating local brick manufacturer.
  3. Supply restrictions: From 1 October 2026, Midland Brick introduced allocations for clay brick products, limiting quantities available to customers according to production capacity.

The restrictions extend beyond face bricks to structural products, including Maxi bricks commonly used in WA residential construction.

As reported by The Urban Developer in September 2026, Midland Brick has struggled to keep pace with construction demand, prompting supply restrictions across WA’s building industry.

When Will Brick Supplies Improve?

On 29 September 2026, the WA Government announced up to $4 million in funding to support the recommissioning of Austral’s Cardup brickworks.

This includes $3 million towards reopening the facility, a $500,000 incentive for resuming operations by March 2027, and a further $500,000 for producing 17 million Maxi bricks within 12 months of restarting.

Once operational, the facility is expected to increase WA’s brick production by approximately 10–15%.

However, March 2027 is a reopening target rather than a guaranteed end to the shortage. Builders could continue facing supply constraints while manufacturing capacity increases.

How Is the Brick Shortage Affecting Perth Builders?

For builders, limited brick availability is more than a supply issue. It can affect construction schedules, trade coordination, project costs and the ability to take on new work.

Why Are Brick Shortages Delaying Construction?

Traditional double-brick construction relies on masonry walls to provide structural support. Without sufficient bricks, construction cannot progress through the brickwork stage as planned.

This can delay subsequent trades, including roofing, electrical, plumbing and internal fit-out work.

The impact is particularly significant for smaller builders with limited purchasing power or established supply arrangements.

In an ABC Perth interview on 20 October 2026, Master Builders WA Vice President Cliff Kearns warned that smaller builders constructing one to three homes annually were receiving almost no brick allocations. He also reported that some brick transport operators had advised customers that further bricks would not be available until 2027.

What Are Builders Doing Instead?

Builders are considering several approaches to manage the shortage.

Approach What It Means for Builders
Waiting for brick supplies Retaining traditional construction methods but potentially delaying projects.
Sourcing bricks elsewhere Exploring interstate supply, which may introduce additional transport costs and compatibility challenges.
Switching to framed construction Using steel or timber framing with compatible external wall systems to reduce reliance on structural bricks.

As reported by realestate.com.au, builders like Summit Homes has spent the past three years reducing its reliance on double brick, using steel framing and brick veneer construction.

Three years ago, approximately half of Summit’s homes were constructed using double brick. That proportion has reportedly fallen to around one-third in 2026, with further reductions expected in 2027.

For projects still in the planning or design stage, steel framing provides an opportunity to reconsider the structural system rather than waiting for traditional materials.

Why Are Builders Choosing Steel Framing?

Steel framing is already an established construction method across residential, commercial and modular projects. However, the current brick shortage has highlighted another advantage: reduced dependence on masonry.

Can Steel Frames Replace Double-Brick Construction?

Yes. An appropriately engineered steel framing system can replace the structural function of double-brick walls.

Instead of relying on masonry for structural support, the building uses engineered steel wall frames. External walls can then be finished using several suitable materials, including:

  • Fibre cement cladding.
  • Autoclaved aerated concrete (AAC) panels.
  • Metal cladding.
  • Architectural wall panels.
  • Brick veneer.

Importantly, brick veneer still requires an external layer of bricks. Steel framing combined with suitable non-brick cladding can remove the need for conventional brick external walls altogether.

For a more detailed comparison, read our guide to double brick alternatives in Perth.

What Are the Benefits of Steel Framing?

Beyond reducing dependence on bricks, steel framing offers several practical advantages for builders.

Benefit Why It Matters for Builders
Reduced brick reliance Structural steel frames can be combined with non-brick wall systems.
Prefabricated construction Frames are manufactured off site and delivered ready for installation.
Manufacturing precision Computer-designed components help minimise on-site adjustments and material waste.
Reduced trade dependencies Structural wall framing does not rely on bricklayers.
Long-term durability Steel is termite-resistant and will not rot, shrink or warp like timber.
Design flexibility Steel framing accommodates different building layouts and external finishes.

Prefabrication can be particularly useful when managing construction schedules. Manufacturing frames to approved designs before delivery reduces the amount of measuring, cutting and assembly required on site.

While switching to steel framing can reduce reliance on constrained brick supplies, construction timelines still depend on manufacturing capacity, engineering approvals, other building materials and the availability of installation trades.

Steel framing is also not a direct substitute for every double-brick design. Structural engineering, insulation, weatherproofing and building approvals must all be considered when selecting an alternative construction method.

How Steel Frames WA Is Helping Perth Builders

At Steel Frames WA, we manufacture and supply prefabricated steel framing systems for residential, commercial and modular construction projects throughout Western Australia.

Backed by a team with more than 50 years of experience in building and modular construction, we work with builders to develop practical framing solutions suited to their project’s requirements.

Complete Steel Framing Solutions

We provide a comprehensive range of steel framing products, including:

Our service covers design, engineering, manufacturing, supply and professional steel frame installation.

Using advanced design and engineering software, we manufacture prefabricated components to suit individual project specifications. Frames can then be delivered directly to site, with installation services available where required.

This integrated approach helps builders coordinate their framing requirements through one experienced local supplier.

Can Existing Double-Brick Plans Be Changed to Steel?

In some cases, yes. However, changing from double brick to steel framing requires more than substituting one building material for another.

The structural design, wall dimensions, foundations, external finishes and relevant approvals may all need to be reviewed.

For builders considering a change, we recommend discussing the project with our team early. We can help assess framing requirements and develop a suitable solution alongside the project’s building designer and structural engineer.

Keep Your Project Moving with Steel Frames WA

Perth’s brick shortage is creating uncertainty for builders, but traditional double-brick construction is not the only option.

Steel framing offers a practical alternative that can reduce reliance on structural bricks while providing the advantages of prefabrication, precision and design flexibility.

At Steel Frames WA, we support builders throughout WA with tailored steel framing solutions, from design and manufacturing through to delivery and installation.

Planning a new project or considering an alternative to double brick? Contact Steel Frames WA to discuss your requirements and request a tailored quote.

Sources

  1. Western Australian Government (29 September 2026): Cook Government Supports Cardup Brickworks Recommissioning. Confirms the government funding, planned recommissioning and expected increase in brick production.
  2. The Urban Developer (18 September 2026): Brick Rationing Coming to WA as Supply Struggles to Keep Up. Reports on Midland Brick’s allocation system, production constraints and builder concerns.
  3. ABC Perth (20 October 2026): WA Brick Shortage Bites Amid Housing Boom. Features Master Builders WA discussing the shortage’s impact on smaller builders and expected supply challenges.
  4. realestate.com.au (29 September 2026): What Buyers Need to Know About WA’s Brick Shortage. Examines how WA builders are adapting through steel framing and other construction methods, including Summit Homes.

Information current as at 30 October 2026. Brick availability, supplier allocations and production timelines may change.

Jeremy O’Donoghue

Managing Director at Steel Frames WA

Home-building expert Jeremy O’Donoghue has worked productively in the industry for 15 years, at both ABN and BGC groups. Jeremy is experienced in delivering quality steel frame products that precisely meet client needs.